In 2014 Multiturf turned old tennis courts at Hartley Road School in Durban into three five-a-side football pitches, about 1,900m² in total. This is how the job was done, with photos from the start of the work in September through to the finished pitches in December.

Project: Hartley Road School, Durban
Pitches: 3 five-a-side pitches, about 1,900m² in total
Site before: Old tennis courts
Turf: 50mm V-shape football turf, sand and rubber infill
Built: September to December 2014
Turf replaced: after 8 years, by Multiturf

The starting point: old tennis courts

The site was old tennis courts. Three five-a-side pitches, about 1,900m² in total, were built there, and the existing court area gave a firm, level starting point for the new surface.

Steel poles and rebound wall foundations being set on old tennis courts at Hartley Road School, Durban
September 2014: steel poles going in and the foundations for the brick rebound walls being set on the old tennis courts.

Poles and brick rebound walls

The first stage was setting the steel uprights that carry the netting and floodlights, and building a brick rebound wall around each pitch. The walls were painted bright lime green. They keep the ball in play and let it come back off the side the way players expect in a five-a-side game.

Laying the turf

Once the perimeter was in, the turf went down. We used our 50mm V-shape football turf with a sand and rubber infill. The sand weighs the turf down and the rubber gives cushioning and grip underfoot.

Five-a-side football turf being installed at Hartley Road School, Durban
October 2014: the first pitch turfed, with the lime-green brick rebound walls in place.
Close-up of 50mm football turf at Hartley Road School five-a-side pitch
November 2014: close-up of the 50mm turf and white line markings.

Netting and finishing

Each pitch was fully enclosed in netting, sides and roof, so balls stay inside the pitch and away from the car park next door. White line markings, a centre circle and goals finished the job. The build itself ran to plan with no problems.

Fully netted five-a-side pitch at Hartley Road School, Durban
December 2014: the finished pitch, fully netted with floodlight poles along the sides.
Centre circle and line markings on the Hartley Road School five-a-side pitch
Line markings and centre circle on the finished turf.
Two five-a-side football pitches at Hartley Road School, Durban
Two of the completed pitches side by side.

Still in use today

The pitches are still running today. The original 2014 turf took heavy use from regular games for 8 years before it needed replacing, and Multiturf laid the new surface. The venue has carried on with its games on the new turf.

What a project like this costs

At today’s prices, a similar build of three five-a-side pitches, about 1,900m² in total, costs roughly R1.4 million. That covers the brick rebound walls, steel poles, full netting, floodlights, turf, infill, line markings and goals. The final price depends on the site, mainly what is there now and how much groundwork it needs, so we confirm it after a site visit.

Planning a five-a-side pitch?

If your school, club or venue has old tennis courts or an unused hard court, it can usually be converted the same way. Multiturf has built five-a-side pitches for 20 years and can install anywhere in South Africa. See our football turf options, real prices on our installation price page, or more Durban projects.

Frequently Asked Questions

How big is a five-a-side pitch?

There is no single fixed size. At Hartley Road School the three pitches cover about 1,900m² in total, which suits five-a-side games for juniors and adults.

Can old tennis courts be turned into five-a-side pitches?

Yes. Hartley Road School’s three pitches were built on old tennis courts. Re-using an existing court area can reduce the groundwork needed compared with starting on open ground.

What turf is used for five-a-side football?

At Hartley Road we used Multiturf’s 50mm V-shape football turf with a sand and rubber infill. The infill gives the turf grip and cushioning for regular games.

How much does it cost to build three five-a-side pitches?

At today’s prices, three five-a-side pitches like Hartley Road School’s cost roughly R1.4 million, including brick rebound walls, netting, floodlights and turf. The exact price depends on the site.

How long does five-a-side turf last?

It depends on how much the pitch is used. At Hartley Road School the original turf, installed in 2014, lasted 8 years of regular five-a-side games before we replaced it.

How long does it take to build three five-a-side pitches?

At Hartley Road the work ran from September to December 2014, covering the poles, brick rebound walls, turf, line markings and netting for all three pitches.

Get a quote for your five-a-side pitch

Ready when you are.

Site visits and written quotes across South Africa. Call or WhatsApp:

083 262 9442

For questions, comments or to get a quote, contact us using the form below and we will get back to you.